Monday, 19 December 2011

Great Western Mainline Electrification Project - Structural Clearances

Great Western Mainline Electrification Project - Clearance for 150 Structures
Is it going to fit?

Severn Partnership has been assisting a major engineering consultancy in answering this question for 150 Structures on the Great Western Mainline as part of the Great Western Electrification Project.
Severn Partnership High Accuracy Railway Surveying

Severn Partnership Surveyors have been producing Topographical Surveys to establish Clearances for blacklisted structures and provide sufficient information surrounding the structure to allow for alteration proposals.

The 8 month long project, which ran on time saw at its peak up to 10 structures surveyed in a single night shift.

There were no incidents and Severn ensured that all the data was to the highest Quality, measured Safely and Delivered Professionally on Time.

For more information on our high accuracy railway surveys or to discuss your project requirements further please email: webenquiry@severnpartnership.co.uk or contact Anett Dude on 0844 880 8247 
Topographical Surveys for Structural Clearance Analysis

Saturday, 12 February 2011

Can't survey the wood for the trees - Surveys for Forestry Commission

3D landscape visualisation
3D landscape visualisation

Severn Partnership in conjunction with Parsons Brickerhoff in Cardiff have been selected for a framework contract with the Forestry Commission Wales.

Our surveyors will create 3D topographical surveys for use in in haul road design and cut & fill volume computations for subsequent earthworks.

We will be able to utilise the latest one man robotic total stations in conjunction with Leica's Smartnet RTK GPS to aid productivity and accuracy.

Contact Nick blenkarn or Bob Hutchings for any topographical survey requirements

Contact Us

Tuesday, 8 February 2011

Real time monitoring for track movement 24/7

Severn Partnership was approached by Alun Griffiths (Contractors) Ltd. to offer a
proposal for the monitoring of rails, for movement, during the piling works for a new footbridge adjacent to the railway fence-line.

The proposal needed to adhere to Network Rail Standard NR/BS/LI/045 ‘Monitoring track over or adjacent to Civil Engineering works: procedure and intervention levels.’

The extent of the monitoring, covered 90m of track length over four rails, with prisms located at 3m centres (124 prisms in total).  Readings being taken 24 hours a day, 7 days a week - feeding back data over an Internet link to our office.

Benefits of Automated technique:
  • Minimised on site manpower (security guard only required)
  • Cheaper overall than manned monitoring
  • Real time results, with reports on twist, CANT, gauge & movement
  • Client reports on demand
  • Piece of mind !
24/7 observations - unmanned
3d monitoring control station


Call Nick Blenkarn or Bob Hutchings at Severn Partnership to discuss your track monitoring requirements.

Contact Us

Friday, 23 October 2009

Flood avoidance - The role of Geomatics

Severn Partnership played host to two local MPs, the TSA, EA and ESI to discuss the role of Geomatics in Flooding.  From left to right: Mark Fermor (MD at ESI - Groundwater & Environmental specialists), Owen Patterson (MP, North Shropshire), Philip Dunne (MP, Ludlow), Rory Stanbridge (Secretary General of TSA), Richard Bentley (Operations team leader at the EA).  Discussions ranges from Threshold levels to GNSS RTK survey, LIDAR, Photogrammetry, Shropshire groundwater scheme, modelling for flood risk management and EA asset survey. 

Monday, 21 September 2009

Topographical Survey - Aberystwyth University




Robotic survey techniques have been used to speed up topographical surveying at Aberystwyth University. Surveyors were working 'one man' (or woman) with Trimble S6 and S8 total stations to produce accurate Topo survey plans.