Monday, 5 December 2011

Crossrail High Accuracy Surveying for Tunneling Monitoring

Crossrail Amberg Kinematic Laser Scan Point Cloud - Track
 As the Crossrail project starts it’s tunneling under the streets and infrastructure of London a huge amount of preparation work is going on to prevent monitor and  subsidence. 

Crossrail Amberg Kinematic Laser Scan Point Cloud - Paddington
Tunneling has already begun from the Western Portal, just outside Paddington Station, where The Severn Partnership has been busy compiling a comprehensive data set to be used for the monitoring of Network Rail infrastructure as the huge Tunnel Boring Machines (TBMs) munch their way underneath. 


Crossrail Paddington P-way Track Survey
Combining High Accuracy Leica TS30, 0.5 arc second 0.5mm, Total Stations with the latest Amberg Track Geometry Measuring Devices to coordinate every track and cross over unit on the approach to Paddington Station has provided the Crossrail team with a benchmark survey to monitor changes against. In addition a Kinematic Laser Scan Point Cloud provides a 3 dimensional model of all overhead line equipment and gantry structures prior to the TBMs passing underneath. Should any movement occur during tunneling, the entire stretch of track and infrastructure can be precisely reinstated with confidence. If all goes to plan, no one will even know the machines have been there....


For more information or to discuss your project requirements further please email: webenquiry@severnpartnership.co.uk or contact Rollo Rigby on 0844 880 8247  

Tuesday, 8 February 2011

Real time monitoring for track movement 24/7

Severn Partnership was approached by Alun Griffiths (Contractors) Ltd. to offer a
proposal for the monitoring of rails, for movement, during the piling works for a new footbridge adjacent to the railway fence-line.

The proposal needed to adhere to Network Rail Standard NR/BS/LI/045 ‘Monitoring track over or adjacent to Civil Engineering works: procedure and intervention levels.’

The extent of the monitoring, covered 90m of track length over four rails, with prisms located at 3m centres (124 prisms in total).  Readings being taken 24 hours a day, 7 days a week - feeding back data over an Internet link to our office.

Benefits of Automated technique:
  • Minimised on site manpower (security guard only required)
  • Cheaper overall than manned monitoring
  • Real time results, with reports on twist, CANT, gauge & movement
  • Client reports on demand
  • Piece of mind !
24/7 observations - unmanned
3d monitoring control station


Call Nick Blenkarn or Bob Hutchings at Severn Partnership to discuss your track monitoring requirements.

Contact Us

Monday, 21 September 2009

UTX Monitoring movement on railway lines



Our monitoring teams were called up to install a series of targets the monitor movement or live railway lines during the drilling of an undertrack crossing (UTX) near Kidderminster. Our cost efficient monitoring solution can be used to give real time movement reports, calculate displacement in x,y,z, rail twist, track CANT and absolute level. Survey teams will monitor movement while the drilling takes place from a place of safety and without being affected by the zone of influence.

For more information, call our Survey Manager - Bob Hutchings (0844 880 8247) or e-mail webenquiry@severnpartnership.co.uk