Monday, 19 December 2011

Great Western Mainline Electrification Project - Structural Clearances

Great Western Mainline Electrification Project - Clearance for 150 Structures
Is it going to fit?

Severn Partnership has been assisting a major engineering consultancy in answering this question for 150 Structures on the Great Western Mainline as part of the Great Western Electrification Project.
Severn Partnership High Accuracy Railway Surveying

Severn Partnership Surveyors have been producing Topographical Surveys to establish Clearances for blacklisted structures and provide sufficient information surrounding the structure to allow for alteration proposals.

The 8 month long project, which ran on time saw at its peak up to 10 structures surveyed in a single night shift.

There were no incidents and Severn ensured that all the data was to the highest Quality, measured Safely and Delivered Professionally on Time.

For more information on our high accuracy railway surveys or to discuss your project requirements further please email: webenquiry@severnpartnership.co.uk or contact Anett Dude on 0844 880 8247 
Topographical Surveys for Structural Clearance Analysis

Monday, 12 December 2011

Track Renewals - Track Alignment & Cess Detail Surveying

High Accuracy Track Alignment & Cess Detail Surveying
With the continuous need to replace rail track, the Renewal train has played a vital role in delivering this rapid renewal system.  Working alongside this, Severn has provided the high accuracy survey data critical to its continuing success.

Track Renewal Train - Railway Surveying
Recently Severn have completed over 80,975 yards (approx. 46 miles) of topographical track alignment and cess detail survey along a section of the busy WCML LNW Route.  This work produced 30 digital survey models in both MX Genio and AutoCAD formats and 373 separate SC0 files for ClearRoute Gauging Analysis.

80% of the work was carried out in a Green Zone working environment, utilising both midweek night line blockages and weekend T3 possessions.  All the work was produced to the highest quality standards and delivered professionally on time. 

For more information on our high accuracy railway surveys or to discuss your project requirements further please email: webenquiry@severnpartnership.co.uk or contact Jamie Price on 0844 880 8247